Pictures from Week 8
November 17–21, 2014 |
||
Installing the Wood Flooring |
Installing the Wood Flooring - Stair Nosing |
|
![]() |
![]() |
|
Stain the A/C Closets |
Millwork Detailing on the Choir Cloud |
|
![]() |
![]() |
November 17–21, 2014 |
||
Installing the Wood Flooring |
Installing the Wood Flooring - Stair Nosing |
|
![]() |
![]() |
|
Stain the A/C Closets |
Millwork Detailing on the Choir Cloud |
|
![]() |
![]() |